Friday was Good Friday (earliest ever Easter that I can remember!) and Lianne met Marat over at the house first thing in the morning. She is nice enough to bring coffee so they all love her.
Lianne gave Marat/the tiler Leandro some sketches for tiles to be laid in the downstairs bathroom shower and also showed which tiles are to go in the upstairs laundry, downstairs laundry, front hall and powder room on the main floor. She also checked to make sure that there was a 'scratch coat' laid over the wire mesh in the 2 upstairs bathrooms in preparation for us to install the under-tile heating system. Our builder did not want to do it so we said sure we'll do it.
With all the mess happening at the house, with the drywall people and tile people, it's looking like a wreck in there. However, here are some shots of the inside as well as some tile that is complete already!
Master Bath Shower waiting for tile and the skylight/upstairs hall


View from back of house to front...piles of giant tubs of stucco paint, tiles, tiling tools, bags of mortar, drywall tools, drywall compound...and a very long ladder.




A kitchen space Lianne is trying really hard to imagine as complete!

Here is the basement rec room - the fireplace and the opposite wall. We will probably build in some book cases on either side of the fireplace and above it of course, the new flatscreen!

Last, but not least, tiles laid in the front hall (copper slate) and the Powder room (moccachino limestone)